Projects other than power projects; sections applicable.
Checkout our iOS App for a better way to browser and research.
18-2421. Projects other than power projects; sections applicable.
If the agency does not intend to engage in the operation of power projects or the generation or supply of electric energy, sections 18-2422 to 18-2425 shall apply.