Report, when required, contents.

Checkout our iOS App for a better way to browser and research.

Effective - 28 Aug 1971

444.630. Report, when required, contents. — 1. The operator shall file a report with the commission within sixty days after the date of expiration of a permit stating the exact number of acres of land affected by the operation, the extent of the reclamation already accomplished, and such other information as may be required by the commission.

2. The operator shall file another report within thirty days after grading is completed or sixty days after twelve months from the date of expiration of a permit stating the extent of grading and such other information as may be required by the commission.

3. The operator shall file a planting report with the commission within thirty days after revegetation is completed or is to be completed, showing the extent of revegetation and such other information as may be required by the commission.

­­--------

(L. 1971 S.B. 1 § 16)


Download our app to see the most-to-date content.