Negotiation with federal Department of Energy of agreements related to nuclear waste storage characterizations; hearings and approval of agreements

Checkout our iOS App for a better way to browser and research.

  1. The board shall serve as the agency in this state to negotiate written nuclear waste site characterization agreements and modifications and/or technical revisions to these agreements, with the federal Department of Energy on any matter related to the long-term or temporary storage and/or permanent disposal of high-level radioactive waste or transuranic waste.
  2. The board shall serve as the agency in this state to negotiate such written agreements and modifications and/or technical revisions to these agreements, with any federal agency other than the federal Department of Energy on any matter related to the long-term or temporary storage and/or permanent disposal of high-level radioactive waste or transuranic waste.
  3. The board shall consult with the council and the committee during the negotiation of any agreement or modification and/or technical revisions to an agreement executed under subsections (1) or (2) of this section. The council and the committee shall prepare such written comments on any agreement or draft agreement being negotiated by the board as is appropriate and needed.
  4. The board in concert with the council shall hold at least one (1) public hearing within the county or counties wherein the site is located on any proposed agreement or modification and/or technical revision to an agreement negotiated under subsection (1) or (2) of this section. The board shall issue thirty (30) days' notice of the day and location of hearings conducted under this subsection. The board shall prepare a written summary of testimony presented at hearings conducted under this subsection and shall consider the need for modifications or technical revisions to the negotiated agreement as a result of the hearing(s).
  5. No agreement or modification and/or technical revision to an agreement negotiated under subsection (1) or (2) may take effect unless it is approved by a majority of the members of the board.


Download our app to see the most-to-date content.