Reracking.

Checkout our iOS App for a better way to browser and research.

The spent fuel storage pool at Prairie Island may be reracked a third time. The reracking does not require legislative authorization but is subject to other applicable state review. The additional storage capacity added by the third reracking and utilized when added to the total storage capacity of dry cask storage utilized, cannot exceed the total capacity of 17 TN-40 casks.

History:

1994 c 641 art 1 s 9


Download our app to see the most-to-date content.