Filing Detailed Survey Report.

Checkout our iOS App for a better way to browser and research.

The engineer must file the detailed survey report with the auditor where the proceedings are pending and the auditor must deliver a copy of the detailed survey report to the commissioner. The engineer must also file copies of the detailed survey report with the auditors of any affected counties.

History:

1990 c 391 art 5 s 46


Download our app to see the most-to-date content.