Order For Detailed Survey And Survey Report.

Checkout our iOS App for a better way to browser and research.

Subdivision 1. Order. When the preliminary hearing order is filed with the auditor, the drainage authority shall order the engineer to make a detailed survey with plans and specifications for the proposed drainage project and submit a detailed survey report to the drainage authority as soon as possible.

Subd. 2. Waiver. The drainage authority may waive the detailed survey order and the detailed survey if it determines that adequate data, plans, and specifications have been furnished by a United States engineer.

History:

1990 c 391 art 5 s 41


Download our app to see the most-to-date content.