Redetermination of Optimum Flow; Modification of Plan; Hearings.

Checkout our iOS App for a better way to browser and research.

Sec. 31312.

After a determination or plan has been in effect for 5 years, any riparian owner may petition the department for a redetermination of the optimum flow or modification of the plan, and upon a showing of substantial changes in conditions, the department shall hold hearings as provided in section 31305 and may redetermine the optimum flow or modify the plan.

History: Add. 1995, Act 59, Imd. Eff. May 24, 1995
Popular Name: Act 451
Popular Name: NREPA


Download our app to see the most-to-date content.