Project Producing Site Separated Materials; Eligibility for Grant.

Checkout our iOS App for a better way to browser and research.

Sec. 19119.

Any project of the type for which a grant may be available under section 19111, which produces site separated materials, and for which the licenses or permits required by this part and otherwise required by law have been obtained, is eligible to receive a grant under this part.

History: 1994, Act 451, Eff. Mar. 30, 1995
Popular Name: Act 451
Popular Name: NREPA


Download our app to see the most-to-date content.