Cost of Temporary Tracks Constructed Due to Alteration of Grade Crossing

Checkout our iOS App for a better way to browser and research.

Section 76. If such bridge is altered, rebuilt, improved or repaired under sections fifty-nine to sixty-four, inclusive, of chapter one hundred and fifty-nine, the cost of construction of the tracks upon and over such temporary location shall be reckoned as a part of the charges and expenses of the alteration, improvement or repair of the crossing, to be apportioned by the special commission as provided thereunder.


Download our app to see the most-to-date content.