Permit -- Requirements

Checkout our iOS App for a better way to browser and research.

    As a requirement for keeping the facility permit, each facility permit holder shall:

        (1)    Maintain a bond or other security that the Department considers sufficient to cover any cost for:

            (i)    Guaranteeing fulfillment of all requirements related to the facility permit;

            (ii)    Monitoring, maintaining, or closing the facility; and

            (iii)    Assuring the security of the facility after closing;

        (2)    Design, construct, and operate the facility in the manner approved by the Department;

        (3)    Establish emergency procedures and safeguards to prevent accidents and reasonably foreseeable harm to human beings or the environment;

        (4)    Report periodically on the hazardous material that is received and transferred by the facility, including, as applicable, volume, and chemical, physical, biological, and radioactive nature; and

        (5)    To the extent reasonably practicable, restore the facility site to its original condition if use as a facility is terminated.