Replacement or supplementation of energy-consuming equipment

Checkout our iOS App for a better way to browser and research.

    When a primary procurement unit replaces or supplements a major item of energy-consuming equipment in an existing building owned or leased by the State, the procurement of the equipment shall be made on the basis of a life-cycle cost analysis of alternatives in accordance with standards established under § 4-808 of this subtitle.


Download our app to see the most-to-date content.