    (a)    If a drainage project established under this title crosses a railroad right–of–way at the intersection of the right–of–way with a natural watercourse or depression through which water flows at periods of high water, the railroad company shall:

        (1)    construct, build, and maintain any necessary new bridge or culvert; or

        (2)    enlarge, strengthen, reconstruct, or replace any existing bridge or culvert.

    (b)    The expense to the railroad under subsection (a) of this section shall be:

        (1)    considered an element of damage to the railroad company by the board of viewers; and

        (2)    shown as a damage in the report of the board of viewers.