Spill prevention control and clean-up plan

Checkout our iOS App for a better way to browser and research.

§1318-C. Spill prevention control and clean-up plan

A responsible party may develop and submit to the commissioner spill prevention, control and clean-up plans referred to in this section as "the plan" to address discharges of hazardous matter.   [PL 1991, c. 208, §3 (NEW).]

1.  Plan content.  Spill prevention control and clean-up plans must include at a minimum the following information:  

A. The hazardous matter and substances covered including the reportable quantity for each hazardous matter and mixture measured in pounds if a solid and in pounds and gallons if a liquid;   [PL 1993, c. 355, §53 (AMD).]

B. Any containment and diversionary structures or equipment where appropriate;   [PL 1991, c. 208, §3 (NEW).]

C. Inspection, maintenance and testing procedures for storage and containment areas;   [PL 1991, c. 208, §3 (NEW).]

D. A list of emergency response equipment and locations and a description of the capabilities of the equipment;   [PL 1991, c. 208, §3 (NEW).]

E. A description of employee training programs;   [PL 1991, c. 208, §3 (NEW).]

F. A description of areas in need of protection and method of protection;   [PL 1991, c. 208, §3 (NEW).]

G. A description of discharge detection devices and emergency warning systems;   [PL 1991, c. 208, §3 (NEW).]

H. A list of on-site emergency coordinators and the qualifications of on-site trained employee responders;   [PL 1991, c. 208, §3 (NEW).]

I. A description of evacuation procedures and assembly points;   [PL 1991, c. 208, §3 (NEW).]

J. Notification procedures for federal, state and local officials;   [PL 1991, c. 208, §3 (NEW).]

K. Procedures for supplying written reports to the department;   [PL 1991, c. 208, §3 (NEW).]

L. General response and clean-up protocols by substance or substance class;   [PL 1991, c. 208, §3 (NEW).]

M. Specific on-site containment, treatment or removal plans;   [PL 1991, c. 208, §3 (NEW).]

N. A description of the record-keeping process for responses involving the implementation of this plan;   [PL 1991, c. 208, §3 (NEW).]

O. A description and copies of mutual aid agreements and any agreements with clean-up contractors; and   [PL 1991, c. 208, §3 (NEW).]

P. A promulgation statement and date of plan adoption.   [PL 1991, c. 208, §3 (NEW).]

[PL 1993, c. 355, §53 (AMD).]

2.  Submission.  The plan and all amendments to the plan must be submitted to the commissioner upon adoption or amendment.  

[PL 1991, c. 208, §3 (NEW).]

3.  Amendments.  The plan must be amended as necessary to reflect current conditions at the facility or as determined appropriate by the facility or state agencies.  

[PL 1991, c. 208, §3 (NEW).]

SECTION HISTORY

PL 1991, c. 208, §3 (NEW). PL 1993, c. 355, §53 (AMD).