Minimum excavation for pavement on a concrete base

Checkout our iOS App for a better way to browser and research.

§3359. Minimum excavation for pavement on a concrete base

Unless otherwise required in a municipal ordinance or regulation, when any excavation is made in any paved public highway and the pavement is laid on a concrete base, the excavation must have the pavement and concrete cut back on each side of the excavation ditch a distance of 8 inches, and in issuing the permits for cutting the pavement this extra width must be charged to the person applying for the permits.   [PL 1999, c. 337, §10 (AMD).]

SECTION HISTORY

PL 1999, c. 337, §10 (AMD).


Download our app to see the most-to-date content.