Contact with or damage to facility; procedure; notification requirements.

Checkout our iOS App for a better way to browser and research.

66-1810. Contact with or damage to facility; procedure; notification requirements.
When any contact with or damage to any underground facility occurs, the operator shall be informed immediately by the excavator. Upon receiving such notice, the operator immediately shall dispatch personnel to the location to provide necessary temporary or permanent repair of the damage. If the protective covering of an electrical line is penetrated or dangerous gases or fluids are escaping from a broken line, the excavator immediately shall inform emergency personnel of the municipality in which such electrical short or broken line is located and take any other action as may be reasonably necessary to protect persons and property and to minimize hazards until arrival of the operator's personnel, emergency medical responders or first responders.

History: L. 1993, ch. 217, § 10; L. 1998, ch. 78, § 2; L. 2002, ch. 41, § 7; L. 2010, ch. 119, § 18; Jan. 15, 2011.


Download our app to see the most-to-date content.