Time of lien posting.

Checkout our iOS App for a better way to browser and research.

572.9 Time of lien posting.

The statement of account required by section 572.8 shall be posted by a general contractor or subcontractor within two years and ninety days after the date on which the last of the material was furnished or the last of the labor was performed.

[R60, §1851; C73, §2137; C97, §3092; C24, 27, 31, 35, 39, §10278; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §572.9]

87 Acts, ch 79, §1; 2007 Acts, ch 83, §5; 2012 Acts, ch 1105, §5, 27, 28; 2012 Acts, ch 1138, §13

Referred to in §572.31


Download our app to see the most-to-date content.