468.111 Bridges at natural waterway — costs.
The cost of building, rebuilding, constructing, reconstructing, changing, or repairing, as the case may be, any culvert or bridge, when such improvement is located at the place of the natural waterway or place provided by the railroad company for the flow of the water, shall be borne by such railroad company without reimbursement therefor.
[S13, §1989-a18; C24, 27, 31, 35, 39, §7542; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §455.121]
89 Acts, ch 126, §2
CS89, §468.111