Sec. 22.5. "Extraordinary cost" means the cost to a utility to relocate existing facilities that is either:
(1) more than ten percent (10%) of the total operating revenue received by the utility during the utility's most recent full fiscal year; or
(2) more than fifty percent (50%) of the total estimated cost of a proposed highway or bridge construction or improvement project.
As added by P.L.63-1992, SEC.1.