Bridge Constructed Under Chapter and Crossing Wabash River

Checkout our iOS App for a better way to browser and research.

Sec. 26. (a) This section applies only to a bridge that:

(1) was constructed under this chapter; and

(2) crosses the Wabash River.

(b) Notwithstanding any other provisions of this chapter, a bridge subject to this section does not become a part of the system of state highways free of tolls or a tollway under IC 8-15-3 when bonds are retired and all funds fully reimbursed.

(c) Money collected for the use of a bridge subject to this section shall be allocated to the authority and used for the following purposes:

(1) Operation of the toll bridge facility.

(2) Maintenance of the toll bridge facility.

(3) A reserve fund for future toll bridges over the Ohio River to be located within the same county in which the bridge subject to this section is located.

As added by P.L.386-1987(ss), SEC.17.


Download our app to see the most-to-date content.