Transfer of Authority to Supply Piped Drinking Water to Person Other Than City or Town; Time of Test; Rules

Checkout our iOS App for a better way to browser and research.

Sec. 1. Within thirty (30) days before the date that the authority to supply piped drinking water is transferred from a city or town to a person other than a city or town, the state department of health shall conduct a test to determine the quality of the drinking water supplied by the city or town. The state department of health shall adopt rules under IC 4-22-2 concerning the test that is required under this section.

As added by Acts 1981, P.L.105, SEC.1. Amended by P.L.2-1992, SEC.79.


Download our app to see the most-to-date content.