Petition by Eligible Utility for Rate Adjustment

Checkout our iOS App for a better way to browser and research.

Sec. 8. (a) Except as provided in subsection (d), an eligible utility may file with the commission a petition setting forth rate schedules establishing an amount that will allow the adjustment of the eligible utility's basic rates and charges to provide for recovery of infrastructure improvement costs. The adjustment shall be calculated as a monthly fixed charge based upon meter size.

(b) The eligible utility shall serve the office of the utility consumer counselor a copy of its filing at the time of its filing with the commission.

(c) Publication of notice of the filing is not required.

(d) An eligible utility may not file a petition under this section in the same calendar year in which the eligible utility has filed a request for a general increase in the basic rates and charges of the eligible utility.

As added by P.L.94-2000, SEC.1. Amended by P.L.209-2014, SEC.9; P.L.212-2015, SEC.8; P.L.91-2017, SEC.7.


Download our app to see the most-to-date content.