Changes in Public Project; Validity of Design-Build Contract

Checkout our iOS App for a better way to browser and research.

Sec. 1. A design-build contract may be conditional upon subsequent refinements in scope and price and may permit the public agency to make changes in the scope of the project without invalidating the design-build contract.

As added by P.L.74-2005, SEC.1.


Download our app to see the most-to-date content.