Methods for Assignment or Designation of Assets

Checkout our iOS App for a better way to browser and research.

Sec. 6. The plan of operation must specify the following:

(1) The method of assignment of closed block assets referred to in section 5 of this chapter that is being used.

(2) The methods by which the designations of assets or portions of assets are changed during the course of closed block operations.

As added by P.L.94-1999, SEC.3.


Download our app to see the most-to-date content.