Plugging and Abandoning Hole

Checkout our iOS App for a better way to browser and research.

Sec. 10. Upon the completion of drilling, a permittee shall plug and abandon the hole in a manner that confines permanently all fluids or materials in the separate strata originally confining the fluids or materials by the use of mud-laden fluid, cement, or plugs used:

(1) singly; or

(2) in combinations approved by the commission.

[Pre-1995 Recodification Citation: 13-4-5-8 part.]

As added by P.L.1-1995, SEC.31.


Download our app to see the most-to-date content.