Rules

Checkout our iOS App for a better way to browser and research.

Sec. 17. The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site.

As added by P.L.35-2001, SEC.7.


Download our app to see the most-to-date content.