Monument

Checkout our iOS App for a better way to browser and research.

Sec. 10. Within one (1) year after the court has established the average normal water level or area, the department shall construct a suitable permanent monument as prescribed in the findings of the court on the shore of the lake. The monument must contain the following:

(1) The name of the lake.

(2) The average water normal level.

(3) The size if established.

(4) The highest level to which the lake has risen during the ten (10) years preceding the time of the filing of the complaint.

[Pre-1995 Recodification Citation: 13-2-13-1(b).]

As added by P.L.1-1995, SEC.19.


Download our app to see the most-to-date content.