Requirements for Issuance of Permits for Solid Waste, Hazardous Waste, and Atomic Radiation

Checkout our iOS App for a better way to browser and research.

Sec. 3. The board shall establish requirements for the issuance of permits to control solid waste, hazardous waste, and atomic radiation, including the following:

(1) Permits to control or limit the disposal of any contaminants onto or into the land.

(2) Permits for the construction, installation, or modification of facilities, equipment, or devices:

(A) to control or limit any discharge, emission, or disposal of contaminants into the land; or

(B) for the storage, treatment, processing, transferring, or disposal of solid waste or hazardous waste.

(3) Permits for the operation of facilities, equipment, or devices:

(A) to control or limit the discharge, emission, transfer, or disposal of any contaminants into the land; or

(B) for the storage, transportation, treatment, processing, transferring, or disposal of solid waste or hazardous waste.

(4) Permits for the disposal of coal combustion residuals in landfills and surface impoundments.

[Pre-1996 Recodification Citation: 13-7-10-1(e).]

As added by P.L.1-1996, SEC.5. Amended by P.L.133-2012, SEC.97; P.L.100-2021, SEC.6.


Download our app to see the most-to-date content.