Biennial Needs Assessment Report on Hazardous Waste Management Facility

Checkout our iOS App for a better way to browser and research.

The division shall no less than biennially assess capacity, demand, generation, and other factors which may affect the determination of the need for a hazardous waste management facility in Georgia to be built with state support and involvement and shall include in the biennial report required by Code Section 12-8-186 a needs assessment report relative to the need for such a facility and the continued need for the assessment required by this Code section.

(Code 1981, §12-8-188, enacted by Ga. L. 1993, p. 1429, § 1; Ga. L. 2002, p. 415, § 12.)


Download our app to see the most-to-date content.