Moratorium on construction of nuclear power facilities.

Checkout our iOS App for a better way to browser and research.

No construction shall commence on a fifth nuclear power facility until the Commissioner of Energy and Environmental Protection finds that the United States Government, through its authorized agency, has identified and approved a demonstrable technology or means for the disposal of high level nuclear waste. As used in this section, “high level nuclear waste” means those aqueous wastes resulting from the operation of the first cycle of the solvent extraction system or equivalent and the concentrated wastes of the subsequent extraction cycles or equivalent in a facility for reprocessing irradiated reactor fuel and shall include spent fuel assemblies prior to fuel reprocessing.

(P.A. 79-487; P.A. 11-80, S. 1.)

History: Pursuant to P.A. 11-80, “Commissioner of Environmental Protection” was changed editorially by the Revisors to “Commissioner of Energy and Environmental Protection”, effective July 1, 2011.


Download our app to see the most-to-date content.