(1) The operator of an amusement ride shall notify the division, within such times and in such manner as established by rule of the director, regarding:
Any injury caused by an equipment failure of an amusement ride;
The installation of any new amusement rides; and
The schedule for the location of the operation of amusement rides.
Source: L. 2008: Entire part added, p. 1022, § 3, effective May 21.