Electric utilities shall interconnect with renewable energy cooperatives organized pursuant to section 7-56-210, C.R.S. Every renewable energy cooperative that desires to interconnect its system with any facilities owned or operated by a public utility shall comply with applicable interconnection rules and with reasonable standards and policies related to the reliability of the public utility system. All such standards and policies, as well as all costs for the interconnection, shall be fair, reasonable, and nondiscriminatory to each renewable energy cooperative.
Source: L. 2004: Entire section added, p. 1123, § 4, effective May 27.