Prior to the date of such hearing, the state engineer shall file with the board of county commissioners, before which the hearing will be held, his preliminary report on the proposed irrigation system, showing his estimate of costs, as well as the availability of an adequate water supply, and the general feasibility of the system. In the preparation of such report, the state engineer may require such aid, assistance, maps, and data as he deems necessary, from the proposers of organization. Such report shall be considered a public document and open to general public inspection and examination.
Source: L. 21: p. 519, § 3. C.L. § 2059. CSA: C. 90, § 434. CRS 53: § 149-2-3. C.R.S. 1963: § 150-2-3.