The entire costs of all sewerage and water connections, closets, equipment pipe, sewer pipe, labor, and necessary engineering, legal, and publication expenses shall be ascertained by the governing body, including an additional amount of six percent for costs of inspection, collections, and other incidentals. The cost to each owner shall be determined according to the material used and work done under the contract in connecting such property to the public sewer and water main. The engineering, legal, and publication expenses shall be charged in such proportion as each connection bears to the whole.
Entire title R&RE, p. 1265, § 1, effective July 1.
This section is similar to former § 31-35-503 as it existed prior to 1975.