Commission to promulgate rules and regulations - limitations.

Checkout our iOS App for a better way to browser and research.

(1) The commission may promulgate rules and regulations establishing criteria for the engineering design of hazardous waste disposal sites and for the location of such sites to the extent that site characteristics are integrally related to the safe engineering design of such sites. Such rules and regulations shall take into account at least the following: Protection of surface and subsurface waters, suitable physical characteristics, distance from waste generation centers, access routes, distance from water wells, and final closure.

  1. The commission may also promulgate rules and regulations establishing what constitutes a substantial change in ownership, design, or operation of a hazardous waste disposal site under section 25-15-206.

  2. The rules and regulations promulgated by the commission pursuant to this sectionshall be based upon generally accepted scientific data.

Source: L. 81: Entire article R&RE, p. 1349, § 1, effective July 1. L. 83: Entire section R&RE, p. 1094, § 12, effective June 3. L. 92: Entire section amended, p. 1260, § 22, effective August 1.


Download our app to see the most-to-date content.