Allocations are limited to only the seismic rehabilitation portion of the improvement project, as determined by the State Architect. To the extent that other elements of work are proposed, a cost-sharing formula shall be developed by the State Architect which will be applicable to planning and design costs for the total project. The retrofitting portion of any project shall, to the greatest extent possible, be conducted during the same general period of time that life safety hazards, including, but not limited to, asbestos-related hazards or fire and panic safety hazards, are abated, or when periodic renovation or maintenance of the essential services building is performed.
(Added by Stats. 1990, Ch. 23, Sec. 2. Approved in Proposition 122 at the June 5, 1990, election.)