Section 7969.

Checkout our iOS App for a better way to browser and research.

In any gassy tunnel or underground mine the division shall review plans for electrical lighting and power for equipment. When it is necessary for safety, the inspector may require changes in the amount and type of lighting, and may require permissive-type wiring, switches, tools, and equipment.

(Added by Stats. 1972, Ch. 1430.)


Download our app to see the most-to-date content.