Section 7809.

Checkout our iOS App for a better way to browser and research.

Any proposed railroad track may be permitted to cross any track already constructed, the crossing being made as provided in Chapter 1 of this division. In laying down the track and preparing therefor, not more than one block shall be obstructed at any one time, nor for a longer period than 10 working days.

(Enacted by Stats. 1951, Ch. 764.)


Download our app to see the most-to-date content.