Section 75541.

Checkout our iOS App for a better way to browser and research.

Within six months after the date of establishing a zone or zones, all water-producing facilities located within the boundaries of such zone or zones shall be registered with the district and, if required by the board, shall be measured with a water-measuring device satisfactory to the district, which shall be installed by the district or, at the district’s option, by the operator thereof.

(Added by Stats. 1965, Ch. 75.)


Download our app to see the most-to-date content.