Section 7261.

Checkout our iOS App for a better way to browser and research.

When gathering and stacking temporary floor plank on a lower floor, in preparation for transferring such plank for use on an upper working floor, the steel erector’s personnel shall remove such plank successively, working toward the last panel of such floor, so that the work is always being done from the planked floor.

(Added by Stats. 1970, Ch. 1498.)


Download our app to see the most-to-date content.