Section 7105.

Checkout our iOS App for a better way to browser and research.

If building operations are suspended and the temporary flooring required by this article is removed, the building shall be replanked upon the resumption of work so that every man at work has a covered floor not more than two stories below.

(Repealed and added by Stats. 1970, Ch. 1498.)


Download our app to see the most-to-date content.