Section 6972.

Checkout our iOS App for a better way to browser and research.

(a) A regional transportation agency may utilize the Construction Manager/General Contractor method of procurement to design and construct projects pursuant to this section.

(b) A regional transportation agency may enter into a Construction Manager/General Contractor contract pursuant to this chapter after evaluation of the traditional design-bid-build method of construction and of the Construction Manager/General Contractor method and the board of the regional transportation agency affirmatively adopts the procurement strategy in a public meeting.

(c) The entity responsible for the maintenance of the local streets and roads within the jurisdiction of the expressway shall be responsible for the maintenance of the expressway.

(Amended by Stats. 2016, Ch. 753, Sec. 3. (AB 2374) Effective January 1, 2017.)


Download our app to see the most-to-date content.