Section 4745.1.

Checkout our iOS App for a better way to browser and research.

(a) Any covenant, restriction, or condition contained in any deed, contract, security instrument, or other instrument affecting the transfer or sale of any interest in a common interest development, and any provision of a governing document, as defined in Section 4150, that either effectively prohibits or unreasonably restricts the installation or use of an EV-dedicated TOU meter or is in conflict with this section is void and unenforceable.

(b) (1) This section does not apply to provisions that impose reasonable restrictions on the installation of an EV-dedicated TOU meter. However, it is the policy of the state to promote, encourage, and remove obstacles to the effective installation of EV-dedicated TOU meters.

(2) For purposes of this section, “reasonable restrictions” are restrictions based upon space, aesthetics, structural integrity, and equal access to these services for all homeowners, but an association shall attempt to find a reasonable way to accommodate the installation request, unless the association would need to incur an expense.

(c) An EV-dedicated TOU meter shall meet applicable health and safety standards and requirements imposed by state and local authorities, and all other applicable zoning, land use, or other ordinances, or land use permits.

(d) For purposes of this section, an “EV-dedicated TOU meter” means an electric meter supplied and installed by an electric utility, that is separate from, and in addition to, any other electric meter and is devoted exclusively to the charging of electric vehicles, and that tracks the time of use (TOU) when charging occurs. An “EV-dedicated TOU meter” includes any wiring or conduit necessary to connect the electric meter to an electric vehicle charging station, as defined in Section 4745, regardless of whether it is supplied or installed by an electric utility.

(e) If approval is required for the installation or use of an EV-dedicated TOU meter, the application for approval shall be processed and approved by the association in the same manner as an application for approval of an architectural modification to the property, and shall not be willfully avoided or delayed. The approval or denial of an application shall be in writing. If an application is not denied in writing within 60 days from the date of receipt of the application, the application shall be deemed approved, unless that delay is the result of a reasonable request for additional information.

(f) If the EV-dedicated TOU meter is to be placed in a common area or an exclusive use common area, as designated in the common interest development’s declaration, the following provisions apply:

(1) The owner first shall obtain approval from the association to install the EV-dedicated TOU meter and the association shall approve the installation if the owner agrees in writing to do both of the following:

(A) Comply with the association’s architectural standards for the installation of the EV-dedicated TOU meter.

(B) Engage the relevant electric utility to install the EV-dedicated TOU meter and, if necessary, a licensed contractor to install wiring or conduit necessary to connect the electric meter to an EV charging station.

(2) The owner and each successive owner of an EV-dedicated TOU meter shall be responsible for all of the following:

(A) Costs for damage to the EV-dedicated TOU meter, common area, exclusive use common area, or separate interests resulting from the installation, maintenance, repair, removal, or replacement of the EV-dedicated TOU meter.

(B) Costs for the maintenance, repair, and replacement of the EV-dedicated TOU meter until it has been removed and for the restoration of the common area after removal.

(C) Disclosing to prospective buyers the existence of any EV-dedicated TOU meter of the owner and the related responsibilities of the owner under this section.

(g) The association or owners may install an EV-dedicated TOU meter in the common area for the use of all members of the association and, in that case, the association shall develop appropriate terms of use for the EV-dedicated TOU meter.

(h) An association that willfully violates this section shall be liable to the applicant or other party for actual damages, and shall pay a civil penalty to the applicant or other party in an amount not to exceed one thousand dollars ($1,000).

(i) In any action by a homeowner requesting to have an EV-dedicated TOU meter installed and seeking to enforce compliance with this section, the prevailing plaintiff shall be awarded reasonable attorney’s fees.

(Added by Stats. 2018, Ch. 376, Sec. 2. (SB 1016) Effective January 1, 2019.)