Section 4003.

Checkout our iOS App for a better way to browser and research.

The engineer directing, supervising or superintending the construction, or in charge of the engineering work for or in connection with public work shall keep an accurate account of the cost of the public work.

(Enacted by Stats. 1943, Ch. 134.)


Download our app to see the most-to-date content.