Section 36457.2.

Checkout our iOS App for a better way to browser and research.

The board may provide that the work shall be done under the direction and to the satisfaction of the engineer of work, that the materials used shall comply with his specifications and be to his satisfaction, and that he shall make and sign the assessment.

(Added by Stats. 1965, Ch. 268.)


Download our app to see the most-to-date content.