Section 2727.1.

Checkout our iOS App for a better way to browser and research.

“Idle” means that an operator of a surface mining operation has curtailed production at the surface mining operation, with the intent to resume the surface mining operation at a future date, for a period of one year or more by more than 90 percent of its maximum annual mineral production within any of the last five years during which an interim management plan has not been approved.

(Amended by Stats. 2011, Ch. 491, Sec. 1. (SB 108) Effective January 1, 2012.)


Download our app to see the most-to-date content.