Section 20130.

Checkout our iOS App for a better way to browser and research.

If the board of supervisors is advised by the county surveyor or engineer that any wharf, chute, or other shipping facility can be constructed or repaired for a sum less than the lowest responsible bid, it may reject all bids and order the work done by day’s work under the supervision and direction of the surveyor or engineer.

(Added by Stats. 1982, Ch. 465, Sec. 11.)


Download our app to see the most-to-date content.