Susitna River power project annual report.

Checkout our iOS App for a better way to browser and research.

The authority shall prepare, not later than the first day of each regular session of the legislature, an annual report summarizing the status of the Susitna River power project and shall notify the legislature that the report is available.


Download our app to see the most-to-date content.