Waiver of requirements by written agreement.

Checkout our iOS App for a better way to browser and research.

An operator and an excavator may, by written agreement, waive the requirements of AS 42.30.400 - 42.30.490 that the excavator notify the operator of planned excavations and that the operator locate underground facilities. The agreement must identify the geographic areas to which the waiver applies and the time period for which the waiver is valid.


Download our app to see the most-to-date content.