Limitation.

Checkout our iOS App for a better way to browser and research.

AS 29.60.400 - 29.60.440 do not require that a recipient of a grant for a feasibility study must proceed with construction of the project, regardless of whether the project is determined to be feasible.


Download our app to see the most-to-date content.