Liquidated damages clause in cooperative contracts.

Checkout our iOS App for a better way to browser and research.

The contract referred to in AS 10.15.215 may fix and require liquidated damages to be paid by the member to the cooperative in the event of a breach of the contract by the member. Liquidated damages may be a percentage of the value or a specified amount per unit of the products, goods or services involved by the breach, or a specific sum.


Download our app to see the most-to-date content.